A phased move of a monolithic application with assessment, pilot, parallel running and a rollback plan.

Fictional scenario. An example situation that illustrates the approach. It is not a client project and describes no measured results.

Business problem

A fictional B2B application runs in an ageing data centre. Updates are risky and the hosting contract is ending.

Assumptions

  • A landing zone exists or will be built.
  • The database can be replicated.
  • There is a maintenance window.

Constraints

  • No data loss.
  • A rollback plan for every step.
  • Minimal disruption for customers.

Reference architecture

Components by stage — an illustration, not a running system and not a certified design.

  1. 01Assessment

    • Inventory
    • Dependencies
    • Costs
  2. 02Preparation

    • Landing zone
    • Network link
  3. 03Migration

    • Database replication
    • Parallel running
    • Cut-over
  4. 04After migration

    • Monitoring
    • Cost optimisation
The diagram as a list
StageComponents
AssessmentInventory, Dependencies, Costs
PreparationLanding zone, Network link
MigrationDatabase replication, Parallel running, Cut-over
After migrationMonitoring, Cost optimisation

Interfaces

FromToVia
Data centreCloudVPN or private link
Old databaseNew databaseReplication
DNSNew environmentGradual switch

Data flow

  1. Data is replicated continuously.
  2. The new environment is tested in parallel.
  3. Traffic is switched gradually.
  4. The old environment stays ready for rollback.
  5. It is turned off once stable.

Security boundaries

  • Encryption in transit.
  • Permissions reviewed in the new environment.
  • Secrets moved to a store.

Where a person approves

  • Every traffic switch.
  • Turning off the old environment.

Delivery phases

  1. 01 · Assessment

    Inventory, risks, plan.

  2. 02 · Pilot

    A non-production environment.

  3. 03 · Cut-over

    Production with a rollback plan.

  4. 04 · Optimisation

    Right-sizing and costs.

Limitations

  • The monolith stays a monolith — modernisation is a separate step.
  • Licences may limit the options.

Trade-offs

  • Lift and shift — fast but without cloud benefits.
  • Parallel running — costlier for a while but safer.

Facing something similar?